Tadcaster - Bathroom
- 
Client having new bathroom fitted 
What we did
- 
To save time and mess, we agreed with the client to leave the tiles on 
- 
Client primed the walls saving labour costs 
- 
We then overboarded the ceiling as at some point the ceiling had been plastered leaving the down lights in! Leaving a flush finish! 
- 
The walls were bonded out using a backing plaster 
- 
All the walls and ceiling were then plasterered 